Nusa Karvak geomatics

Bahasa IndonesiaEnglish

Raw Coal Export Continues

BENGKULU – export results of coal mining that is still made from crude continues until yesterday. Despite starting Sunday (12/1) employers or local governments are prohibited from exporting, except the mining results already done processing or pemurnihan in advance.

Addressing these problems will, in the province has not been able to do penjegahan or export restrictions. "Continued kan. There has been no dissemination to regions. In addition there is no operational guidelines and juknis (guidelines and technical instructions, red),"said Assistant II Setdaprov Bengkulu, Ir. Edy Waluyo, yesterday.

When asked by journalists, She claimed the Provincial Goverment has never been invited by the Central Government over the policy. As is known the ban the export of raw minerals and coal are in accordance with article 170 ACT Number 4 Year 2009 About Mineral and Coal Mining (Minerba).

The article mentions that the holder of the contract works was producing purifying obligatory no later than five years from the date of the ratification ACT Minerba 12 January 2009. Does That Mean, start date 12 January 2014, raw materials mine that has not been through a process of purification (ore) not be exported. "There has been no, How do follow-ups. The new undangnya – applied yesterday,"Add Edy Waluyo.

In the meantime, yesterday was held the meeting coordination plan to build railroads in Bengkulu – Muara Enim between the consortium with the local Government of Bengkulu province in the Vibrant area of Balai Raya. The meeting was led by Governor H. Thys Michels Hamsyah, S.Ag. M. Pd, diampingi Assistant II Ir. Edy Waluyo, Kadishubkominfo Drs. Eko Agusrianto and Karo Ismed out of Economy, S. Sos, MM.

While the Consortium was attended by Dr.. Djoko Soedibyo as President Director of PT Mandela Resources. In the kesempetan, Thys Michels Hamsyah Governor is hoping the process of tender the construction of the railway can be implemented immediately. So that the construction can also be realized. He's in the near future will communicate with the Minister of transport, EE Mangindaan.

"Railroad Infrastructure is one to accelerate development and improve the economy. I hope quickly realized,"said Thys Michels Hamsyah.

Thys Michels Hamsyah also ask, whether the ACT Number 4 Year 2009 About Mineral and Coal Mining can disrupt the development of the railway. As it known, the railway plan is the more transporting mining results from Muara Enim and surroundings.

Djoko Soedibyo heard questions that ensure Thys Michels will be uninterrupted. After the meeting to reporters, Djoko explained, the domestic needs of mining results, especially very large coal.

"No problem, the Interior just less, for the production of. If there is a (railroads,red) most likely, will all wake up processing plant. Included in Bengkulu,"says Djoko.

The plan will be ditender mercesuar project in July – August. There Are 4 things to be prepared, the tender documents and preparation of them from konsorusium. "The work was approximately 5 year,"so Djoko. (ble)

Source: harianrakyatbengkulu dot com

Scroll to Top